Skip to content
[ Evidence gates ]

EG-04 · Evaluation and reliability control

The engineer detects a seeded behavior regression, holds release, repairs the cause and coverage, and reruns invalidated gates.

Elaboration
Task, trajectory, outcome, safety, and operational checks are proportionate to mission risk. The seeded regression is found without disclosing the scoring key. No threshold or expected result is edited merely to turn a failure green.
Source record
Forward-Deployed Engineering Standard FDE-S/1.0, evidence gate EG-04

A definition here is not a claim about any person, engagement, or outcome.

Back to the field reference